Skip to main content

Inspections and Construction

2024 Material and Construction Specifications.pdfWhen To Install An Irrigation Back-out Meter Letter.pdfDevelopement Agreement - Standard Subdivision.pdf

 

Water Line Inspection (up to 100 feet)$75 + $75 Trip Charge
Water Line Inspection per connection/unit$75 per unit
Water Line Additional inspection (>100 Feet)$1 per foot
Sewer Line Inspection (up to 100 feet)$75 + $75 Trip Charge
Sewer Line Inspection per connection/unit$75 per unit
Sewer Line Additional inspection (>100 Feet)$1 per foot
Fireline Inspection (up to 100 feet)$75 + $75 Trip Charge
Fireline Inspection per connection/unit$75 per unit
Fireline Additional inspection (>100 Feet)$1 per foot
Grease Interceptor Inspection$75 + $75 Trip Charge
Dye Test$75 + $75 Trip Charge
Rescheduled Inspection (less than 24 hour notice)$75 + $75 Trip Charge
Preconstruction Meeting$200
As-Built (Data Input)$250
As-Built Deposit (Return on delivery of drawings)$1,250
Rates and Fees.pdf

Prior to Final Acceptance of the project, the applicant must submit a digital copy of field verified As-Built Plans in PDF and DWG format spatially referenced to NAD 1983 State Plane Utah Central FIPS 4302 (feet) and tied to the nearest existing Salt Lake County benchmark monument. Digital As-Built Plans shall have separate layers for culinary waterlines, culinary water services, fire lines, fire hydrants, valves, sanitary sewer lines, sanitary sewer manholes, sanitary sewer laterals, sanitary sewer clean-outs, and pretreatment infrastructure.

Lateral repair inspections, call our office for permit.