Inspections and Construction
Water Line Inspection (up to 100 feet) | $75 + $75 Trip Charge |
---|---|
Water Line Inspection per connection/unit | $75 per unit |
Water Line Additional inspection (>100 Feet) | $1 per foot |
Sewer Line Inspection (up to 100 feet) | $75 + $75 Trip Charge |
Sewer Line Inspection per connection/unit | $75 per unit |
Sewer Line Additional inspection (>100 Feet) | $1 per foot |
Fireline Inspection (up to 100 feet) | $75 + $75 Trip Charge |
Fireline Inspection per connection/unit | $75 per unit |
Fireline Additional inspection (>100 Feet) | $1 per foot |
Grease Interceptor Inspection | $75 + $75 Trip Charge |
Dye Test | $75 + $75 Trip Charge |
Rescheduled Inspection (less than 24 hour notice) | $75 + $75 Trip Charge |
Preconstruction Meeting | $200 |
As-Built (Data Input) | $250 |
As-Built Deposit (Return on delivery of drawings) | $1,250 |
Prior to Final Acceptance of the project, the applicant must submit a digital copy of field verified As-Built Plans in PDF and DWG format spatially referenced to NAD 1983 State Plane Utah Central FIPS 4302 (feet) and tied to the nearest existing Salt Lake County benchmark monument. Digital As-Built Plans shall have separate layers for culinary waterlines, culinary water services, fire lines, fire hydrants, valves, sanitary sewer lines, sanitary sewer manholes, sanitary sewer laterals, sanitary sewer clean-outs, and pretreatment infrastructure.
Lateral repair inspections, call our office for permit.